County Council Branding

News and Events

Timoole Remediation - Update 22nd January 2018 - Excavated area in the south east of the site, depth of the waste, day 9 of excavation

Date Released: 22 January 2018

 

Excavated area in the south east of the site ready for soil testing, once validated clean material can be placed at this location.

 

22 Jan - Ready for Soil Testing

 

 

 

 

Photo illustrating the depth of the waste, circa 5m deep and not at the bottom of waste yet.

22nd Jan - Photo illustrating the depth of waste

 

 

 

Day 9 of excavation and waste depth increasing and with an increased moisture content

22nd Jan - Day 9 of excavation

 

 

 

back to Other News