Bridge Maintenance

Bridge Maintenance

Bridge Rehabilitation Works on Regional and Local Roads

Inspections are ongoing and designs are being progressed. Minor repairs / remedial works are being carried out to a number of bridges following the inspections.

Funding in the amount of €670,000 has been secured in 2023 for the following bridges, with the design of the rehabilitation works currently underway:

  • Springhall Culvert
  • Mellifont Bridge
  • Clonguiffin Bridge
  • New Kilcarn Bridge